CH2 (Tivoli) Council House 2


Project Manager / Builder: Hansen Yuncken Pty Ltd
Consultant: C. J. Arms

We installed the (ESD) plumbing system to the CH2 project which is the first 6 star office building with extensive ESD initiatives. Geschke Plumbing were involved in the extensive shop drawing procedures to bring the project to completion.

Our project schematic drawing for the hydraulics has become a benchmark to measure future ESD projects. CH2 has accessible systems and metering facilities to allow close monitoring of the results of water saving and usage to allow the actual usage results to be used in future ESD designs in the general construction industry. The project has received worldwide recognition of its sustainability systems.

Major plumbing features are: